Resources & Reserves

Mineral Resource Estimate for the Kundip Deposits, Ravensthorpe Gold Project, June 2022 (Flag June 2020)

DepositIndicatedInferredTotal Resources
ktAuAuAgAgCuCuktAuAuAgAgCuCuktAuAuAgAgCuCu
g/tkozg/tkoz%ktg/tkozg/tkoz%ktg/tkozg/tkoz%kt
Open pit COG 0.5g/t AuEq (Flag 0.5g/t Au)Gem7,3201.74001.63700.1102,7601.91601.41200.1410,0801.75601.54900.114
Harbour View1,4602.91404.62100.698501.7502.8800.322,3102.51803.92900.512
Harbour View - Cu
7100-0-0.641900-0-0.518900-0-0.65
Flag530580--0.52702.810--0.305904.790--0.43
Gem Restored
4702302.7400.213401.3102.1200.218001.7402.5600.22
Underground COG 2.0g/t AuEq (Flag 2.0g/t Au)Gem-------103.6-4.7-0.50103.6-4.7-0.50
Harbour View2904.3407.9701.23.57102.7607.7180171,0003.21007.7250110
Harbour View - Cu
400-0-1.60.6900-0-1.411300-0-1.52
Flag1308.330--0.50.62404.430--0.313705.770--0.31
Gem Restored
807.22092010.81805.6307.1400.712606.1507.7600.82
GrandTotal11,0202.17402.17300.3325,4302.13602.54400.31816,4502.11,1002.21,1600.350
Gem7,3201.74001.63700.1102,7701.91701.41200.1410,0901.75601.55000.114
Harbour View1,7503.21805.12900.7131,5602.211052500.693,3102.72905.15400.722
Harbour View - Cu7500-0-0.752700-0-0.821,0200-0-0.77
Flag6505.6120--0.43310440--0.319705.1160--0.44
Gem Restored5502.8503.7700.325102.7503.8600.321,0602.8903.71300.34
GrandTotal11,0202.17402.17300.3325,4302.13602.54400.31816,4502.11,1002.21,1600.350
Open pit10,4801.96501.96300.3274,2001.72301.62200.2814,6801.98801.88500.234
Underground5405.4905.6100161,2303.31305.52200.8101,7703.92205.53200.916
GrandTotal11,0202.17402.17300.3325,4302.13602.54400.31816,4502.11,1002.21,1600.350

The preceding statements of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate significant figures.

Competent Persons Statement:

The information that relates to exploration results is based on information compiled by Mr David Groombridge and Mr Paul Bennett, Competent Persons who are Members of the Australasian Institute of Mining and Metallurgy (“AusIMM”). Mr Groombridge and Mr Bennett are employees of the Company and have sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to each qualify as a “Competent Person” as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Ore Reserves’ (the “JORC Code”). Mr Groombridge and Mr Bennett consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

The information that relates to the data review and validation, drilling, sampling and the geological interpretation of the Gem, Harbour View, Gem Restored and Flag Deposits has been compiled by Mr David Groombridge. The Competent Persons for Mineral Resource estimates are for the Gem and Harbour View Deposits, Ms Justine Tracey, for the Gem Restored Deposit, Ms Jane Levett and for the Flag Deposit, Mr David Coventry. The Competent Persons for the Mineral Resource estimates for Gem, Harbour View and Gem Restored are members and Chartered Professionals of the AusIMM. Ms Tracey and Ms Levett are full-time employees of Snowden-Optiro. The Competent Persons for the Mineral Resource estimate for Flag is a member of the Australasian Institute of Geologists (AIG). Ms Tracey and Ms Levett are full-time employees of Snowden-Optiro. Mr Coventry is a full-time employee of Mining Plus. Mr Groombridge, Ms Tracey, Ms Levett and Mr Coventry have sufficient experience that is relevant to the Technical Assessment of the Mineral Assets under consideration, the style of mineralisation and types of deposit under consideration and to the activity being undertaken to qualify as Competent Persons as defined in the JORC Code. Mr Groombridge, Ms Tracey, Ms Levett and Mr Coventry consent to the inclusion in this announcement of the relevant matters based on their information in the form and context in which it appears.


Ore Reserve Estimate for the Kundip Deposits, Ravensthorpe Gold Project

Kundip - May 2020Open PitUndergroundTotal Ore Reserve
ProbablektAu g/tkozktAu g/tkozktAu g/tkoz
Kaolin3,2081.6165 - - -3,2081.6165
Harbour View2532.4193084.5455603.664
Flag1834.1241333.9173164.041
Total3,6441.82084414.4624,0842.1270

The information that relates to Ore Reserves is based on information compiled by Mr Craig Mann, who is a full-time employee of Entech and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Mann consents to the inclusion of this information in the form and context in which it appears and is a Member of the AusIMM.


Mineral Resource Estimate for the Trilogy Deposit, Jerdacuttup Project 

Trilogy - March 2018   AuAgCuPbZnAuAgCuPbZn
  ktg/tg/t%%%kozkozktktkt

OC (Cu_Eq > 0.5%)

OxInd  129  2.4  85.3  0.5  -  -  10  354  0.6  -  -
Inf  336  1.9  71.7  0.1  -  -  21  774  0.3  -  -
Tr/FrInd  4,476  0.8  52.5  1.4  2.8  1.6  121  7,556  62.0  126.0  72.1
Inf  614  0.7  54.9  0.6  1.3  0.9  14  1,084  3.8  8.2  5.3

UG (Cu_Eq > 2.5%)

Tr/FrInd  28  2.8  21.0  1.3  0.6  0.4  3  19  0.4  0.2  0.1
Inf  18  1.5  19.7  1.4  0.3  1.1  1  11  0.3  0.1  0.2
Sub-totalInd  4,633  0.9  53.2  1.4  2.7  1.6  133  7,929  63.0  126.2  72.2
Inf  968  1.1  60.1  0.5  0.9  0.6  35  1,869  4.4  8.3  5.5
Total  5,601  0.9  54.4  1.2  2.4  1.4  169  9,798  67.3  134.4  77.7

The preceding statements of Mineral Resources conforms to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate significant figures.

Competent Persons & Qualified Persons Statement:

The information in this release that relates to the Estimation and Reporting of Mineral Resources has been compiled by Mr Richard Buerger BSc (Geology). Mr Buerger is a full-time employee of Mining Plus Pty Ltd and has acted as an independent consultant on the Trilogy Polymetallic Deposit Mineral Resource estimation. Mr Buerger is a Member of the Australasian Institute of Geologists (MAIG) and has sufficient experience with the style of mineralisation, the deposit type under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (The JORC Code). Mr Buerger consents to the inclusion in this report of the contained technical information relating the Mineral Resource Estimation in the form and context in which it appears.

The information that relates to the data review and validation, drilling, sampling and the geological interpretation of the Trilogy deposit has been completed by Mr David Groombridge. Mr Groombridge is a full-time employee of Medallion Metals Ltd. Mr Groombridge is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience with the style of mineralisation, the deposit type under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code). Mr Groombridge consents to the inclusion in this report of the contained technical information relating to the Mineral Resource Estimation in the form and context in which it appears.

crossmenu

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from our team.

You have Successfully Subscribed!

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram